Plastic & Metal Manufacturing Vetted Factories in China, Vietnam, Mexico.
Side-by-side landed costs across regions in 48h, plus a 90-day roadmap. Tooling, samples, and audits handled.
What Sets Our Process Apart
NDA / IP Protection
Your designs and tooling stay secure under mutual NDA.
Factory Audits
Every supplier is pre-vetted and compliance checked.
On-Site Quality Control
Inspectors verify quality at the factory floor.
Quotes in 48h
Get landed cost comparisons within two business days.
Why most sourcing attempts fail
Going it alone in global manufacturing often means setbacks you can’t afford. From unexpected expenses to production headaches, here are the challenges that derail most projects:
Problem
- Hidden costs and quality drift derail projects.
- IP exposure and slow timelines eat up margins.
- Too many teams waste months chasing suppliers who can’t deliver.
Solution
- Skip the trial-and-error with a vetted factory network.
- Transparent landed-cost modeling in 48 hours.
- In-country QC teams ensure quality and protect your IP.

Who we’re best for
Not every project is ready for vetted factory sourcing. We work best with teams that already have clear requirements and are serious about moving to production. Here’s how to know if you’re in the right place
- Plastic (injection, extrusion, blow) or Metal (CNC, sheet, die-cast) parts
- MOQ: Pilot 500–1k • Growth 1k–10k • Scale 10k+
- CAD/BOM ready (or within 1–2 weeks)
- Tooling budget approved (we can finance if needed)
From BOM to First Parts Made Simple
Turning CAD files into real, production-ready parts doesn’t have to be complicated. Our process is designed to give you speed, transparency, and confidence at every stage.
Step 1: Submit Your CAD/BOM + Requirements
Upload your CAD/BOM files with materials, tolerances, MOQs, and region preferences so we start with accurate specs.
Step 2: Receive a Landed-Cost Model in 48 Hours
In just two business days, you’ll see side-by-side cost comparisons for China, Vietnam, and Mexico including tooling, tariffs, and logistics.
Step 3: Get a Vetted Factory Shortlist
We deliver a shortlist of pre-audited factories complete with compliance checks, quality reports, and fit for your project needs.
Step 4: Tooling, Sampling & 90-Day Roadmap
From tooling to samples, we manage the process and provide a clear 90-day plan backed by in-country QC.
Choose How to Begin
Every sourcing project starts differently. Whether you need fast cost clarity or a vetted factory shortlist, we offer two clear starting points so you can move forward with confidence.
Free Landed-Cost Model
Get a clear cost picture in just 48 hours with side-by-side comparisons across China, Vietnam, and Mexico. Your model includes a full roll-up from EXW to DDP, covering tariffs, logistics, and lead times—perfect for teams validating budgets and feasibility.
Paid Factory Shortlist
When you’re ready to move forward, we deliver a vetted shortlist of 3–5 factories matched to your CAD/BOM. Each includes audit notes, risk flags, and a sample plan with negotiation support ideal for teams moving into sourcing and production.
Real results, delivered fast.
Why Importivity is the leading product sourcing agency based in the United States

Consumer fitness | ABS enclosure
Outcome:
−22% landed cost, tooling in 7 weeks
How:
Resin re-spec + 1→2-cavity mold + CN freight mix

Industrial | 6061 CNC bracket
Outcome:
PPAP Cpk >1.33, dual-sourced CN + MX
How:
Tolerance stack-up review + fixture redesign

DTC kitchen | PP injection mold
Outcome:
<1.5% scrap, color match ΔE < 2
How:
Gate relocation + cycle-time tuning
What about quality, IP, costs, and timelines?
We know these are the biggest concerns in global sourcing. That’s why we’ve built safeguards into every step of our process.
- Quality → Factory audits, on-site QC, and PPAP sign-off ensure consistent production.
- IP Protection → Mutual NDA, redacted CAD files, and tooling ownership rights keep your designs secure.
- Tooling Cost → Financing options and transfer clauses reduce upfront risk.
- Timelines → Quotes in 48h, tooling in 4–6 weeks, and T1 samples in 6–8 weeks keep projects on track.